Current Opportunities
Reytec Construction Resources is always looking for qualified, minority and prime contractors and suppliers for bid opportunities. We’re currently looking for subcontractors and suppliers in the following areas.
- Concrete Sidewalks and Driveways
- Clearing and Grubbing (Trees and Shrubs)
- Channel Regrading
- Traffic Signal
- Electrical and Fiber optics
- Microtunneling and Boring
- Small Dia Water Line and Sanitary Sewer
- Tree Planting and Landscaping
- Trucking
- TV Inspection
- Concrete Sloped Pavement
- Concrete Curbs
- Asphalt Paving
- Concrete Structures
- Pavers
- Water Line Welding
Bid Opportunities
Please review the upcoming bids noted below and submit your bid at least 2 days before the bid date to Kara Meyer or contact her at 713-600-3014. We encourage you to visit this page each month for new bid opportunities.
Job Name | Owner | Bid Date | Job Description | Documentation Link |
---|---|---|---|---|
NHCRWA-Project 25A-Proposed 84″ Water Line Along CenterPoint Energy Northbelt Corridor | AECOM – North Harris County Regional Water Authority | 5/11/2021 2 pm CST;To attend the Bid Opening by phone, dial 877)-286-5733 and enter conference ID: 892 509 482#. |
Includes construction of approximately 11,740 LF of 84-inch water line along CenterPoint Energy Northbelt Corridor between the proposed SH 249 (SH249) regional pump station (Gessner Road and Beltway 8) to just east of Hollister Road in Harris County, Texas | Drawings & Links |
HPW – West Alabama Paving and Drainage | City of Houston | 5/13/2021 at 10:30 am
CIVCAST |
West Alabama consists of the construction of approximately 3,300 linear feet of 3-lane undivided -with continuous left turn lane- concrete roadway with curbs, gutters, and underground storm sewer system, new inlets, sidewalks, streetlights, traffic signals, on street bike path and underground utilities | Drawings & Links |
Enabling Utilities Landside (EUL) – IAH, Houston, TX Water Main |
Burns MacDonnell | 5/14/2021 at 5 pm CSTBuilding Connected |
This project is to furnish and construct new waterline main adjustment, new underground duct bank, triturator and pump house for the George Bush Intercontinental Airport. Exact scope and bidding direction is to be coordinated with the appropriate B&M estimator. | Drawings & Links |
Enabling Utilities Landside (EUL) – IAH, Houston, TX Water Plant |
Burns MacDonnell | 5/14/2021 at 5 pm CSTBuilding Connected |
This project is to furnish and construct new waterline main adjustment, new underground duct bank, triturator and pump house for the George Bush Intercontinental Airport. Exact scope and bidding direction is to be coordinated with the appropriate B&M estimator. | Drawings & Links |
Enabling Utilities Landside (EUL) – IAH, Houston, TX Triturator |
Burns MacDonnell | c | This project is to furnish and construct new waterline main adjustment, new underground duct bank, triturator and pump house for the George Bush Intercontinental Airport. Exact scope and bidding direction is to be coordinated with the appropriate B&M estimator | Drawings & Links |
Enabling Utilities Landside (EUL) – IAH, Houston, TX Underground Duct Bank |
Burns MacDonnell | 5/14/2021 at 5 pm CSTBuilding Connected |
This project is to furnish and construct new waterline main adjustment, new underground duct bank, triturator and pump house for the George Bush Intercontinental Airport. Exact scope and bidding direction is to be coordinated with the appropriate B&M estimator. | Drawings & Links |
RFB 3620 Junior Beck Dr (Bear Ln to Old Brownsville Rd) Bond 2018 | City of Corpus Christi | 6/2/2021 at 2:30 pm CST
CIVCAST |
Reconstruction of approximately 3,300 linear feet of 40’ B-B roadway, 1,800 linear feet of new 30’ rural section from Junior Beck Drive from Bear Lane to Old Brownsville Road. Additional improvements include upgrades or replacements to the Stormwater, Water, Wastewater and Gas systems, and related coordination with the City and private utility owners. | Drawings & Links |