CITY OF HOUSTON - Kirby Drive Sewer Relief Project Segment 3

Reytec is the Prime Contractor to the City of Houston and is responsible for the traffic control, street lighting, pavement markings, pollution prevention, site work/landscaping, demolition of existing concrete/asphalt paving (curbs, sidewalks, storm sewer), This project consists of approximately 2,945 linear feet of 14-ft x 12-ft reinforced concrete box storm sewer, 1,544 linear feet of 24-inch, 30-inch, 36-inch, and 48-inch storm sewers, 395 linear feet of 8-in through 24-in water line and concrete roadway reconstruction with curb 752,000 square yards of 10” concrete paving, 6” curb and gutter, and stamped concrete sidewalks. ?

The location of this project, which centered around the Kirby and University Blvd. intersection, which is one of the most congested areas in the City. We worked with over 42 different organizations, including Neighborhood HOA’s and business groups on a daily bases. Communication with these groups was critical to our overall work plan. We had to coordinate with numerous local businesses on access and egress to their establishments, including working nights and weekends if required.

Contract Amount: $14,377,097.00