CITY OF BEAUMONT - Calder Avenue Drainage Diversion and Pavement Improvement

Reytec is the Prime Contractor to the City of Beaumont and is responsible for performing all street and drainage improvements on Calder Street from MLK Pkwy to Main Street and on Elizabeth Street from Walnut Street to the riverside. The project consists of removal of all landscape, pilings, asphalt overlay, concrete pavement and curb, driveways, sidewalks, inlets, manholes, culverts, and storm sewer pipe. In addition, Reytec will install new storm sewer boxes, inlets, asphalt stabilized base, concrete pavement, curb and gutter, brick paver sidewalks, driveways, and wheel chair ramps, traffic signals, new fiberglass lamp poles; construct base and concrete pavement with curb and gutter; return all Right of Way elevations.

Contract Amount: $24,208,669.36