BAYTOWN AREA WATER AUTHORITY - 30”/16” Water Transmission Main

Reytec is the Prime Contractor to the Baytown Area Water Authority. The project consists of the installation of approximately 26,000lf of 30” AWWA C-905 PVC pipe including valve, fittings, and approximately 5,300lf of 16” AWWA C-905 PVC pipe including valves and fittings. Both the 30” and 16” are being installed by open cut method. 1,000lf of 30” AWWA C-905 PVC pipe to be installed using the Slurry Auger Method. 1,424lf of 30” AWWA C-905 PVC pipe in 48” OD steel casing installed by Auger Method.

Contract Amount: $9,068,660.00